Skip to main content

Banff Wastewater Treatment Plant Modification

Project Details

Client: N-Viro Systems Canada LP
Location: Banff, Alberta
Building Type: Civil/Industrial
Contract: Construction Management

The Project and Construction Management for the conversion of the City of Banffs’ existing Biosolids Facility to the new N-Viro Systems patented process. New system adoption required the installation of live-bottom hoppers for sanitary sewer overflow (SSO), inclined screw conveyors, grinder, two–screw conveyors, a 15 MT/hr mixer, two – 43 m3 silos, an inclined belt conveyor, air compressors and blowers, a humidification scrubber and odour control upgrades to process higher loads of ammonia.