This project was carried out over two locations, and generally consisted of the decommissioning and demolition of the existing partially above grade concrete reservoir with all associated pumps and storage tanks, and the design, supply and install of two new glass-fused-to-steel bolted reservoirs including foundation, appurtenances, factory-built pumping station and all associated pumps, HVAC, electrical systems instruments and controls. Additionally fibre network communications were coordinated as well as hydroservicing.