New installation of the building envelope system, including vapor barrier, insulation, weather guard and new metal cladding was carried out. The project scope also included installation of new aluminum panel windows and curtain wall windows, complete with wall tie-ins, caulking and trim and new roofing with wood parapet framing and cap flashing. It also included installation of wall mounted lighting fixtures, doors and signage. Work was also required within the interior areas of the building, which included decommissioning, removal and disposal of existing fan coils, baseboards, unit heaters and air vents with subsequent replacement including supply, install and commissioning. Substantial completion was successfully achieved prior to students return.