- Process facility addition constructed adjacent to the existing building to support expanded Nutella preparation operations.
- Scope includes a structural steel frame and a IMP façade.
- Our team also completed the Ferrero DC Pallet Conveyor Mezzanine to support a pallet conveyor system within the active distribution centre, with construction split into two phases to maintain ongoing operations in an occupied environment.
