Located along the Northern shore of Lake Superior, a $58-million joint infrastructure project developed by Biigtigong Nishnaabeg and Indigenous Services Canada is being made to serve over 168 homes and key community facilities including the administration office, health centre, schools, and daycare. 

Key Infrastructure:

    • Lake Superior raw water intake pipe (1,800 meters long, 250 mm diameter)
    • Low-lift pumping station with a precast concrete wet well
    • Conventional package filtration system
    • Ultraviolet (UV) and chlorine disinfection
    • Below-grade 709 m³ concrete reservoir

Construction of a water supply and treatment plant consisting of a water intake, raw water distribution pipes with a low-lift pumping station, water treatment plant, and distribution system. A three kilometer pipeline is being installed under the lake bed, and pipes running under the lake bed will require enough pressure to ensure water flow.

A unique aspect of this project is the concurrent construction of two separate buildings, with separate mechanical, electrical, instrumentation, and monitoring systems, presenting their own challenges in timing, scheduling, and site coordination.

A horizontal directional drill has been used to install both the raw water transmission main and the water main transmission. Scuba divers have been used to install the raw water transmission into the infrastructure in the bay, and installation of an advanced monitoring program, equipment, and laboratory for water analyzation and testing.

Most recently, the plant has received certified by Environmental Public Health Services that it is producing clean water. The three watermains have now been connected to the existing community watermain, ensuring clean and more reliable water supply is now available.