Client:ClaimSecure Inc.
Location:Sudbury, Ontario
Sector:Building
Market:Commercial
Delivery:Construction Management

ClaimSecure Data Centre

Project Description

This Certified Tier III Data Centre was built within an existing shopping mall. Complex scheduling ensured the 60,000 square foot project was constructed without any disturbance to the adjacent operating businesses. The new state-of-the-art facility houses 25,000 sq.ft. of “white space” for Database Administration, 20,000 sq.ft. for cutting edge office space and 15,000 sq.ft. of electrical infrastructure to support the system. Within the electrical room located on a heavily secured level of the building is a 4,500 sq.ft. server room home to 350 servers. The environment has humidity control, 20-tons of dedicated cooling and a monitoring system to ensure stability.

Strict supervision of trades and construction activities allowed us to minimize noise and respect the experience of shoppers passing inches away from the construction zone. Despite the enhanced site management and diligence, the project was completed ahead of schedule and on-budget.

Additionally, a10MW electrical service was installed with three substations. Two new 3MW generators with 7-second startup and two separate 3KW uninterruptible power supply (UPS) modules ensure power redundancy.